SJC Clear Channel Digital Advertising

Posted Posted in California Office, Projects

Digital signage upgrade at silicon valley’s airport, San Jose Mineta SJC. Design-build, and fiber infrastructure for 84 new digital signs throughout the airport. Location: San Jose Mineta Airport (SJC) General Contractor: Daktronics

Kaiser Permanente 110 Cooper Street SCZ

Posted Posted in California Office, Projects

Located in Santa Cruz, California, this five-story building will be the home of the future Kaiser medical offices that include provider offices, blood draw, and a pharmacy. Kaiser leased 6,872 square feet of the second floor and 14,769 square feet of the fifth floor in this existing building. Scheduled to begin construction in early 2021, […]

Kaiser Fremont Backfill & Oncology Pharmacy

Posted Posted in California Office, Projects

The Kaiser Permanente Medical Center and Offices, located in Fremont California, offers a wide range of medical services including emergency department, pharmacy, cardiology, dermatology, and optometry along with several administration and business offices across multiple buildings on campus. This project is approximately 13,200 square feet of tenant improvement space on levels two and three of […]

Kaiser Fremont Fire Alarm Replacement

Posted Posted in California Office, Projects

39400 Paseo Padre Pkwy has been the home to Kaiser for nearly two decades. Kaiser Fremont opened its doors in the fall of 2002 and serves nearly 90,000 members of the greater Fremont, Tri-City area, and Southern Alameda County. This project, spanning three buildings on the Kaiser campus, will replace the existing Siemens fire alarm […]

CSU East Bay & Core

Posted Posted in California Office, Projects

Purposefully located in the center of campus CORE and the Hub for Entrepreneurship and Innovation will provide students with the technology, tools, and access to faculty and professional expertise they need to excel in today’s rapidly changing job market. CORE will be divided into three levels, each dedicated to serving different purposes for students. The […]

Genesis Marina

Posted Posted in California Office, Projects

Genesis Marina is a 3 building, 700,000 total square feet on an 8.87-acre site on the Sierra Point Peninsula. The project includes a life sciences campus consisting of combined office and lab R&D with commercial, recreational and restaurant uses within three distinct buildings above a two-story podium parking garage. Location: Brisbane, CA General Contractor: Webcor Construction

PDX Airport Rental Car Quick-Turnaround Facility

Posted Posted in Portland Office, Projects

The Rental Car Quick-Turnaround Facility at PDX efficiently and safely fuels and cleans rental cars to meet the current demands of airport customers, while being able to accommodate future growth. The 150,000 square foot indoor fueling facility will house 16 car wash bays, 36 fuel dispensers, and office space. Contract includes a new MV feeder […]

Providence St. Vincent Reskin

Posted Posted in Portland Office, Projects

The main reason for construction was to do external repairs, to make it water-tight and for energy efficiency. Those external repairs involve recladding the exterior with a new aluminum and glass skin. The new exterior curtain wall, or skin, will save energy and help the hospital better control temperatures. Work on the building also will […]

Pacific Northwest Ballet School

Posted Posted in Portland Office, Projects

Renovation of approximately 33,000 square foot warehouse and office area for use as a Ballet School. The design build renovation includes interior tenant improvements, as well as exterior envelope upgrade and limited site improvements. The project also included the demolition of the existing PNWB space to make way for Sound Transit Light Rail Projects. The […]