U of O Lewis Integrative Science Building

Posted Posted in Mid Valley Office, Projects

The Lewis Integrative Science Building at the University of Oregon opened its doors on October 26, 2012. The 103,000 square foot building is home to research clusters centered around interdisciplinary and integrative research missions; its purpose is to create new synergies across diverse academic disciplines by literally uniting the sciences. The building houses biologists, chemists, […]

U of O Jane Sanders Stadium

Posted Posted in Mid Valley Office, Projects

Jane Sanders Stadium is the sleek new home for the Oregon Ducks Softball team. A state-of-the-art 1,500 fixed-seat stadium, this facility is inspired by one of the most innovative and respected athletic brands in the country but fits gracefully into the fabric of the University of Oregon campus. Designed to achieve LEED® Gold certification—a unique […]

U of O Erb Memorial Union

Posted Posted in Mid Valley Office, Projects

The Erb Memorial Union is situated directly in the heart of the University of Oregon Campus. Since it first opened in 1950, the EMU served as the social and student activities hub of the UO, but the existing building no longer adequately met the University’s expanding needs. OEG installed all electrical and low voltage services […]

U of O Ford Alumni Center

Posted Posted in Mid Valley Office, Projects

The Ford Alumni Center on the U of O campus and is a four story 60,000 square foot building housing an interactive campus visitors center; a 200-seat ballroom; and offices for the University Office of Development, Alumni Association and University Foundation. The ground floor—Oregon Story, an interactive, multi-media experience—serves as a launching point for prospective […]

U of O Allan Price Commons & Research Library

Posted Posted in Mid Valley Office, Projects

A 28,900 square foot renovation of the existing Science Library, a subterranean structure located between Cascade Hall and Klamath Hall. The renovation included extensive build-out of the existing space as well as a modest expansion of the space. Scope includes space/seating for food service’ commons area; commons area; individual and group study areas; tutoring and […]

Stoel Rives Tenant Improvement

Posted Posted in Portland Office, Projects

OEG completed this nine-floor tenant improvement for Portland’s largest law firm, Stoel Rives. The 121,000 square foot first generation build-out is located in the new Park Avenue West Building in Downtown Portland. The new office includes a two-floor conference center, five attorney floors and two administrative floors. Additionally, numerous collaborative spaces are available for meetings […]

OSU Valley Football Center

Posted Posted in Mid Valley Office, Projects

The project includes the addition of 55,000 square feet to the existing center that will benefit student athletes, the football program and all OSU athletics programs which serve more than 500 student athletes participating in 17 sports. The renovation and addition will include a new home team locker room, football program meeting spaces, expanded sports […]

Insitu

Posted Posted in Portland Office, Projects

This 150,000 square foot drone manufacturing and testing facility is located in Bingin, WA. The tilt-up included 3 connected buildings—one housing inventory and shipping, one for assembly, and the last reserved for testing of the drones. The three facilities are tied together with 180,000 square feet of Cat6 cable. OEG performed design build services as […]

Google Portland Office Tenant Improvement

Posted Posted in Portland Office, Projects

The project provides tenant improvements to the 17,000 square foot fourth floor in the historic Wells Fargo and Motor Bank buildings. The use of the space is for technological offices, meeting rooms, and café. LED lighting and digital control systems were installed with a new code compliant fire alarm system. Location: Portland, OR General Contractor: Swinerton Builders

First Tech Federal Credit Union Headquarters

Posted Posted in Portland Office, Projects

First Tech Federal Credit Union’s new 156,000 square foot corporate office building is the country’s largest cross-laminated timber structure. The five-story building features floor-to-ceiling windows that open the space up to the natural surroundings, which include a wetlands area and a park with walking trails. Location: Hillsboro, OR General Contractor: Swinerton Builders Explore Additional Portland Office Projects