


Fill out the form below and we’ll get back to you regarding your inquiry.
"*" indicates required fields
OEG is an Everus Company
© 2026 OEG, INC. ALL RIGHTS RESERVED


This project is a tenant improvement of an existing 52,351 square foot warehouse/office space to a new hardware engineering and testing lab. The project consisted of two new 4000A services, assorted electrical equipment, busway installation, fire alarm and branch wiring to support hardware testing equipment, HVAC equipment, and server racks.
Location: Kent, WA
General Contractor: DPR Construction
Sorry, the comment form is closed at this time.