Corporate Office:

(503) 234-9900

3200 NW Yeon Avenue, Portland, OR 97210

Get in Touch!

Fill out the form below and we’ll get back to you regarding your inquiry.

"*" indicates required fields

This field is for validation purposes and should be left unchanged.

© Copyright MDU Construction Resources Group, Inc.

[siteorigin_widget class="SiteOrigin_Widget_Image_Widget"][/siteorigin_widget]The project involved a new four-story pavilion that brought together a number of existing and new outpatient services in a facility that offers convenient access for patients. The new building is located just east of Professional Office Building 1, where the physician parking lot used to...

[siteorigin_widget class="SiteOrigin_Widget_Image_Widget"][/siteorigin_widget]OEG was responsible for all power and data underground raceway and cable, incoming 35KV high voltage power, all 48-volt building power which consist of 5 triple ended 480-volt substations 185 1,200-amp distribution switch boards 225 208-volt branch panels fed by various transformers. Lighting for...

[siteorigin_widget class="SiteOrigin_Widget_Image_Widget"][/siteorigin_widget]This project is around a 30,000 square foot fab addition at the Lam Research facility in Tualatin Oregon. OEG started the programming and design phase of the project with a very aggressive bid and through the design phase were able to develop an estimate...

[siteorigin_widget class="SiteOrigin_Widget_Image_Widget"][/siteorigin_widget]SolarWorld is located at the former Komatsu Plant Facility in Hillsboro, OR. OEG’s scope of work has expanded over the duration of the project to include: new central utility building (CUB), recommission electrical system, IFC, retrofit electrical panels, K3 cell tooling, process chilled water...

[siteorigin_widget class="SiteOrigin_Widget_Image_Widget"][/siteorigin_widget]Austin Hall is the new home to the Oregon State University's School of Business. The 100,000 square foot facility has achieved LEED Gold certification and accommodates as many as 5,000 students every year. The project included a 250-seat auditorium, several tiered classrooms, over 80...