BPA Technical Services Building
Mortenson
Vancouver, WA
DBIA 2023 Design-Build Merit Award
2024
Bonneville Power Administration (BPA) provides clean, reliable, and affordable hydropower over 300,000 square miles to eight states throughout the Pacific Northwest. The multi-year, multi-facility redevelopment project will revitalize the Ross Complex Campus, an active 260-acre facility with multiple offices, maintenance buildings, and a large substation in Southwest Washington.
The redevelopment project will span 10 years and includes project sequencing, logistics, and change management, demolition of several aging facilities on campus, a new chemistry lab, fuel island and adaptive reuse of the hazardous materials building, seismic upgrades, and civil and security infrastructure improvements.
The Technical Services Building (TSB) is the first project on campus and will house lab, office, and workstation modules. The TSB is a critical component of BPA’s operations and will consolidate the control room infrastructure in a new, more efficient, purpose-built space.
As BPA provides 28% of the electric power in the Northwest and powers the lives of three million people, the redevelopment project must be completed without disruptions to campus operations.
OEG’s scope for the construction of this 60,000-square-foot electronic lab and office building included temporary construction power, furnishing, and installation of 2 backup generators as well as all electrical gear, lighting, conduit, and wire for the new building.
Services Provided:
Design Build
Prefabrication
In-House Engineering
LEED Certified/Sustainable Construction