Corporate Office:

(503) 234-9900

3200 NW Yeon Avenue, Portland, OR 97210

Get in Touch!

Fill out the form below and we’ll get back to you regarding your inquiry.

"*" indicates required fields

This field is for validation purposes and should be left unchanged.

© Copyright MDU Construction Resources Group, Inc.

Project Name

Computer Software Company Data Center Expansion

General Contractor

Direct to Owner

Location

Hillsboro, OR

Date
Category
Mission Critical
About This Project

The DH2 expansion is the first 2.5MW capacity increase to their data center since it was completed in May of 2013. OEG provided complete electrical engineering services for the expansion, which included system power studies to increase rack capacities in specific areas, fault current and coordination studies, Neher-McGrath calculations, and lighting design services to upgrade the buildings lighting to an all LED system. OEG’s installation scope of work included a 2.5MW generator, (2) 1100 KVA UPS, all distribution equipment, VESDA system, VRLA battery monitoring system, and a power monitoring system.

The facility offers:

  • Redundant 125KV utility power feeds
  • 12.5 MW of critical power deliver in phases (currently offers 7.5 MW)
  • Power densities available up to 400 watts per square foot.
  • Overall facility size of 85,000 sq.ft. including office and support spaces