Fill out the form below and we’ll get back to you regarding your inquiry.
"*" indicates required fields
© Copyright MDU Construction Resources Group, Inc.
Stack POR03B
Holder Construction
Hillsboro, OR
2024
The buildout of the Core & Shell Space associated with the POR03B building plus the buildout of 24MW to PDUs between Level 1 and Level 2. As part of the Core and Shell buildout, OEG was responsible for installing the MV Cabling from the utility to the new Vista switches.