
Fill out the form below and we’ll get back to you regarding your inquiry.
"*" indicates required fields
OEG is an Everus Company
© 2026 OEG, INC. ALL RIGHTS RESERVED

Stack POR03B
Holder Construction
Hillsboro, OR
2024
The buildout of the Core & Shell Space associated with the POR03B building plus the buildout of 24MW to PDUs between Level 1 and Level 2. As part of the Core and Shell buildout, OEG was responsible for installing the MV Cabling from the utility to the new Vista switches.