Fill out the form below and we’ll get back to you regarding your inquiry.
"*" indicates required fields
© Copyright MDU Construction Resources Group, Inc.
NTT HI2
Lease Crutcher Lewis
Hillsboro, OR
2026 (Projected)
Two-story data center with 11 MW vaults, total capacity of 66MW. Each vault will include prefabricated and self-contained 2MW UPS/Battery/LVS electrical power modules on grade, 3.25MW generators on grade, and 345-ton air-cooled chillers with integral economizers located on the roof.